Jaipur Metro Project in the city is getting pace as the project now got the special flash cut cum wielding machine. This machine will facilitate putting the seamless tracks on the route projected.
Anil Singhal, Deputy Chief Engineer (DMRC PRO), informed that the machine using the Control Temperature and Control Pressure, joins the tracks seamlessly. This eliminates the joints on the tracks.
The tracks are of 18-18 meter and the work was to begin from Sunday morning from the Mansarovar Metro Station. The machine which costs Rs. 8 crore approximately is designed to come the two parts of a track leaving behind no joint signs.
src: daily.bhaskar.com